Sep 02

The latest count on permits...

Posted to 2015 Municipal Water Project by Andy Pederson

88 properties need to take out a well operation permit or permit to abandon the well.  

53  properties  turned in a permit application, but still need to turn in their well affidavit and/or safe water test results.

There are also 37 properties that the building inspector needs to have homes schedule a final inspection and 9 are in process.  

For status, please either visit the Village web site or call 414-351-8811, ext. 1.  


Aug 13

The End is in Sight

Posted to 2018 Street Resurfacing and Culvert Replacement Project by Jake Meshke

Village crews have completed driveway and cross culvert installations on Sleepy Hollow, Standish, and Tennyson. A total of 41 driveway culverts and six (6) cross culverts were replaced. Crews are in the process of completing landscape restoration in the stormwater ditches and anticipate wrapping that up by the end of the week.

The Village paving contractor has requested an extension on start date and is working on a revised schedule. All road resurfacing and landscape restoration will be completed by mid-September.


Feb 21

Meeting - 02/21

Posted to Pelham-Heath Stormwater Grant Project by Jake Meshke

Join us for the next Pelham-Heath Stormwater meeting on February 21, 2018, from 6:00 to 8:00pm at the Schlitz Audubon Nature Center. The focus of this meeting will be on the three prototype ditch designs to address challenging stormwater situations as well as smaller scale solutions individual homeowners can take.